Zawadi directs the crane driver to align the containers which will provide us with dry storage but will also be the home of our main maintenance workshop and the location of our solar battery bank.
The solar installation will be built above the containers and will we hope grow from an initial 32 panels to the 160 that will enable Kivulini to be immune to external power uncertainties and make a dramatic reduction in our environmental footprint and make excellent sense in reducing our long term electricity bills.